PEPL DrillOptima HUD v1.3

Petroleum Exploration (Pvt) Limited — Systems Automation & Telemetry

Rig Status: STANDBY
HSE Audits: 0/4
Daily Est: 0 bbl

Telemetry Control & Config

Drill Bit Rotational Speed (RPM) 0 RPM
Mud Pump Injection Pressure (psi) 0 psi
Mud Circulation Flow Rate (gpm) 400 gpm
Subsurface Geological Formation
Clay (Soft)
Sandstone
Limestone
Basalt (Hard)
Current Depth
1450.0 m
Bit Temperature
60.0 °C
ROP (Rate of Penetration)
0.0 m/hr
Torque Load
0 kNm

Subsurface Seismic Wave Explorer

Model: Seismic-2D v4.0
SCAN STATUS: SYNCED HZ REFLECT: 45Hz AMP GAIN: 32dB GEO SIGNAL: LIQUID REFLECTION
Seismic Frequency 45 Hz
Seismic Gain 32 dB

SCADA Block Valve Control

Block-01 Potohar (Inlet) OPEN
Flow Rate: 840 bbl/hr
Pressure: 1150 psi
Block-02 Sanghar (Mainline) OPEN
Flow Rate: 840 bbl/hr
Pressure: 1080 psi
Block-03 Ghotki (Discharge) OPEN
Flow Rate: 840 bbl/hr
Pressure: 1020 psi

Operations Command Log Feed

System Diagnostics Console
[11:32:17] INFO PEPL DrillOptima HUD Initialized. Local system connection online.
[11:32:18] INFO SCADA Valve Grid status: Sync OK, 3 Valves online, nominal pressure gradient.

HSE Safety Check

PEPL DrillOptima Simulator Report

Petroleum Exploration (Pvt) Limited — Systems & Telemetry Audit Log

Date: 2026-06-11
Time: 11:32:17
Operator ID: PEPL-LK-2026
Telemetry Operator & Systems Engineer
Name: Lokesh Kumar Role: Systems Automation & IT Intern
Department: Exploration & Production (E&P) Institution: Sindh Agriculture University, Tando Jam
Rig Operations Telemetry Summary
Parameter Logged Value Safety Threshold Status
Final Depth Achieved 1450.00 m Goal: 2000.0 m In Progress
Drill Bit Speed (RPM) 0 RPM Max 200 RPM Nominal
Circulation Mud Pressure 0 psi Max 5000 psi Nominal
Bit Heat Index 60.00 °C Max 220.00 °C Nominal
Rate of Penetration (ROP) 0.00 m/hr Target 30.00 m/hr Nominal
SCADA Pipeline Valves Summary
Valve ID & Location Physical State Flow Rate (bbl/hr) Line Pressure (psi) Integrity Check
Block-01 Potohar (Inlet) OPEN 840 bbl/hr 1150 psi Nominal
Block-02 Sanghar (Mainline) OPEN 840 bbl/hr 1080 psi Nominal
Block-03 Ghotki (Discharge) OPEN 840 bbl/hr 1020 psi Nominal
HSE Safety Checklist Audit
Mud-slurry viscosity checks: PENDING Blowout Preventer (BOP) certification: PENDING
SCADA telemetry encryption: PENDING Manual override verification: PENDING
Operations Diagnostics Log (Recent Events)
[11:32:17] INFO: PEPL DrillOptima HUD Initialized. Local system connection online.
[11:32:18] INFO: SCADA Valve Grid status: Sync OK, 3 Valves online, nominal pressure gradient.